Install Checklist
Capture the site details an HSG Laser SA install team needs before the machine lands at your plant. It keeps the handover focused on access, utilities, lifting arrangements, and the space around the cutting cell.
How Install Checklist works across an install week
Install Checklist sets out the site points to confirm before an HSG Laser SA machine arrives. It covers the basics South African plants need to review around access, services, floor space, and setup readiness.
Start by noting the machine model, delivery address, and who controls entry at the gate. Gauteng dust, coastal humidity, backup power arrangements, and shared factory traffic can change how an installation is sequenced across Johannesburg, Durban, Cape Town, and other South African sites.
Add current bay photos, power board pictures, and any obstructions near the planned machine position. Early notes on door widths, rigging limits, or missing air supply help prevent hold-ups when the truck, crane, or forklift arrives.
Site details to record
A completed checklist should show the machine location, service readiness, and the people responsible for each outstanding item. Keep the wording plain so maintenance, production, and receiving staff can all work from the same record during the install period.
Before sending the form, confirm the power specification, compressed air provision, offloading method, and room available for operator access and maintenance.
- Door and passage widths measured
- Main power point photographed clearly
- Site contact and access hours listed
South African plant checks
Record whether the truck will enter directly, wait at security, or transfer the crate to a smaller vehicle. Some industrial parks restrict delivery times, while older factories may have tight turning circles, low canopies, or limited space for offloading equipment.
Note any conditions that affect commissioning, such as unstable supply, high airborne dust, salt exposure, or shared compressor capacity. Where generators are used, mention them in the checklist so startup planning can account for power quality and changeover procedures.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Photos and attachments needed
Use this install checklist to record floor photos, access timing, power readiness, and any issues already picked up. Keep the subject line clear and factual.
Attach images of the install area, access route, electrical connection point, and compressed air setup where available. Include any drawing, marked-up layout, or service note that helps confirm machine placement before the HSG Laser SA team arrives.